跳转至主要工程内容
SIPHNET
SIPHONET ECOSYSTEM (2026 to 2036)

Siphonet EcoSystem 生态系统

四大专业品牌协同发力:工业、商业建筑、基础设施与核心材料,全面遵循 EN 12056-3 水力标准与 BIM 全周期工程体系。

Siphonet EcoSystem 生态系统

One Hydraulic Core, Four Specialized Engineering Divisions

Large-span roofs do not share identical structural, acoustic, or rainfall constraints. An automated semiconductor cleanroom requires zero interior downpipes and vibration-free overhead collectors, whereas an international airport terminal must evacuate 250+ mm/h typhoon cloudbursts across sweeping curved trusses.

The Siphonet EcoSystem organizes our engineering, certified materials, and field execution into four specialized divisions — all governed by a single full-bore negative-pressure hydraulic engine compliant with EN 12056-3 and ASME A112.6.9.

Siphonet EcoSystem architectural hydraulic cutaway
Siphonet EcoSystem architectural overview: anti-vortex roof outlets feeding 0%-slope PE100 HDPE horizontal collectors and perimeter risers.

How the Four Divisions Work Together

Division Primary Building Typologies Core Engineering Advantage
Siphonet Industrial EV Gigafactories, Semiconductor Fabs, Logistics Warehouses Zero interior downpipes, 0% overhead slope, uninterrupted AGV floorplates
Siphonet Building Shopping Malls, Hospitals, High-Rise Podiums, Convention Centers Saves 450–850 mm ceiling plenum height, acoustic & condensation control
Siphonet Infrastructure Airport Terminals, MRO Hangars, Stadiums, Rail & Metro Stations Typhoon-rated 150–300+ mm/h capacity, wide-span truss integration
Siphonet Material All Siphonic Projects & OEM Partners 304/316L anti-vortex outlets, EN 12201 PE100 HDPE, steel rail-anchoring
3D BIM Isometric Siphonic Pipe Network
Full 3D BIM hydraulic isometric model validating negative-pressure balance (-10 to -80 kPa) prior to site prefabrication.

From BIM Digital Twin to Hydrostatic Commissioning

Every project within the Siphonet EcoSystem follows a deterministic 4-stage delivery protocol: (1) IDF storm-intensity modeling, (2) 3D Revit/BIM clash-free pipe routing with rail-anchoring calculations, (3) electrofusion PE100 prefabrication, and (4) full hydrostatic & vacuum commissioning prior to handover.