One Hydraulic Core, Four Specialized Engineering Divisions
Large-span roofs do not share identical structural, acoustic, or rainfall constraints. An automated semiconductor cleanroom requires zero interior downpipes and vibration-free overhead collectors, whereas an international airport terminal must evacuate 250+ mm/h typhoon cloudbursts across sweeping curved trusses.
The Siphonet EcoSystem organizes our engineering, certified materials, and field execution into four specialized divisions — all governed by a single full-bore negative-pressure hydraulic engine compliant with EN 12056-3 and ASME A112.6.9.
How the Four Divisions Work Together
| Division | Primary Building Typologies | Core Engineering Advantage |
|---|---|---|
| Siphonet Industrial | EV Gigafactories, Semiconductor Fabs, Logistics Warehouses | Zero interior downpipes, 0% overhead slope, uninterrupted AGV floorplates |
| Siphonet Building | Shopping Malls, Hospitals, High-Rise Podiums, Convention Centers | Saves 450–850 mm ceiling plenum height, acoustic & condensation control |
| Siphonet Infrastructure | Airport Terminals, MRO Hangars, Stadiums, Rail & Metro Stations | Typhoon-rated 150–300+ mm/h capacity, wide-span truss integration |
| Siphonet Material | All Siphonic Projects & OEM Partners | 304/316L anti-vortex outlets, EN 12201 PE100 HDPE, steel rail-anchoring |
From BIM Digital Twin to Hydrostatic Commissioning
Every project within the Siphonet EcoSystem follows a deterministic 4-stage delivery protocol: (1) IDF storm-intensity modeling, (2) 3D Revit/BIM clash-free pipe routing with rail-anchoring calculations, (3) electrofusion PE100 prefabrication, and (4) full hydrostatic & vacuum commissioning prior to handover.




