
Early-Stage Engineering Peer Review & Risk Audits
Involving Siphonet during RIBA Stage 2–3 schematic design eliminates MEP truss clashes, reduces subterranean civil storm piping tonnage, and validates rooftop ponding deflections against structural steel allowances.
Advisory Deliverables
- Gravity vs. Siphonic CAPEX/OPEX lifecycle feasibility comparison
- Climate-resilience extreme storm overload modeling (200–250 mm/h)
- ESG embodied carbon & raw material tonnage savings report
需要针对您屋面工程的虹吸技术支持?
EN 12056-3 & ASME A112.6.9 Certified Engineering Team