EN 12056-3 虹吸系统水力设计与计算

基于满流负压水力平衡原理,提供 Revit BIM 三维管网深化及东南亚暴雨强度校核计算。

EN 12056-3 虹吸系统水力设计与计算

Precision Negative-Pressure Network Modeling

Every roof catchment is simulated node-by-node against EN 12056-3 and ASME A112.6.9 limits so horizontal collectors achieve full-bore priming velocities (>0.7 m/s self-cleansing) without exceeding cavitation thresholds (-80 kPa).

Hydraulic Engineering Scope & Calculations

  • Catchment & Weir Zoning: Subdivide multi-hectare roofs into balanced pressure zones with independent emergency overflow scuppers.
  • Two-Phase Flow & Cavitation Check: Verify sub-atmospheric pressure profile at every elbow, reducer, and tee junction under peak tropical rainfall (180–250 mm/h).
  • Parallel Loop Balancing: Maintain differential friction tolerance within ±10% between asymmetric roof outlets discharging into common collectors.

Engineering Deliverables

  • Stamped EN 12056-3 node-by-node hydraulic calculation dossier (PDF & Excel schedule)
  • Autodesk Revit MEP LOD 400 isometric pipe routing & hanger load tables
  • Complete Bill of Quantities (BOQ) for SS316/SS304 outlets, PE100 HDPE, and C-channel anchor rails

需要针对您屋面工程的虹吸技术支持?

EN 12056-3 & ASME A112.6.9 Certified Engineering Team