m² Roof
25,000 m²
Design Rain
190 mm/h
Peak Flow
1,350 L/s
Downpipe Reduction
-75% (28 SRO)

Challenge
Fragmented multi-bay roofs with high parapet walls and internal gutter discharge points where gravity trenches were impractical. Client: HINRO SOJU - KOREA | Contractor: YOUNGJIN - WONPONG | Design: 2025 | Install: 2026.
Hydraulic Solution
Siphonic collector networks rated at 150–200 L/s per line routing central roof runoff cleanly overhead to perimeter stacks. Supplier: Siphonet Joint Stock Company.
CAPEX / OPEX Result
75% fewer vertical stacks, cost-effective MEP routing, and improved operational safety for production & storage.