Installation & Commissioning

Certified electrofusion welding supervision, thermal expansion rail alignment, hydrostatic pressure verification, and handover O&M dossiers.

Installation & Commissioning

Zero-Leak Electrofusion Field Execution

High-velocity siphonic collectors experience significant dynamic thrust during storm priming. Our certified field supervisors manage installation, thermal rail alignment, digital weld logging, and hydrostatic commissioning.

Field Quality & Testing Protocol

  • Peeling & Cleaning Discipline: Mechanical pipe-end rotary scraping and alcohol degreasing prior to electrofusion clamp insertion.
  • Fixed Anchor Spacing: Rigid bracing at collector direction changes and vertical stack transitions per structural truss reaction tables.
  • Hydrostatic & Vacuum Integrity Testing: 2-hour pressure hold verification (0.5–1.5 bar static test) prior to architectural ceiling closure.